Report Icon

Incident Report – 02/15/2012
Cr 319 Lgts, Proctor, TX 76468

Download Full Report

Download Full Report
Price
$4.99
FeatureCheck
Includes Owner Information
FeatureCheck
Formatted for Commercial, Legal, and other Professional Usage
FeatureCheck
Download as PDF
Money-back Guarantee.

Summary


On February 15, 2012, a fire department near PROCTOR, TX responded to a fire incident at Cr 319 Lgts, Proctor, TX 76468, an industrial/utility/defense/agriculture/mining property.

The alarm was received at 3:56 PM, 7 suppression personnel arrived at 4:05 PM, the incident was controlled at 4:11 PM, and the last unit was cleared at 5:31 PM. The time to arrive was 9 minutes, the time to control the incident was 6 minutes, and the total incident time was 1 hour, 35 minutes.

The following action was taken during the incident: extinguish.

Sponsored

Location


Type Street address
Address Cr 319 Lgts, Proctor, TX 76468
County Comanche County
State TX
City PROCTOR
Zip Code 76468
Property Use Utility, defense, agriculture, mining, other

Timeline


  • Alarm

    Alarm received at

  • Arrived

    Arrived at

    Alarm to arrival: 9 minutes

  • Incident Controlled

    Incident controlled at

    Alarm to incident controlled: 6 minutes

  • Last Unit Cleared

    Last unit cleared at

    Alarm to last unit cleared: 1 hour, 35 minutes

Response


Incident Type Grass fire
Mutual Aid Given/Received None
Resources Include Mutual Aid No

Personnel


Support Personnel 7
EMS Personnel 0
Other Personnel 0

Actions Taken


First Action Taken Extinguish

Metadata


Incident Key TX_CT104_02152012_0021512_0
State Texas
Fire Department ID CT104
Incident Date 02/15/2012
Incident Number 0021512
Exposure Number 0
NFIRS Version 5.0

Fire Report

Ignition


Area of Origin Open area - outside; included are farmland, field
Heat Source Arcing
Item First Ignited Agricultural crop, including fruits and vegetables
Cause of Ignition Failure of equipment or heat source
Factor Contributing To Ignition Cutting, welding too close to combustible

On-Site Materials


On-Site Material Tools (power & hand tools)

Structure


Not Residential No

Acres


Acres Burned 0
Less Than One Acre Yes

Equipment


Equipment Power Gasoline
Equipment Portability Portable
Sponsored